New Agent mode
This posting is no longer accepting applications.

Extension: Drainage Engineer (International)

Expired

Requirnment

Overview of position

Somalia Urban Resilience Project II (SURP II) is a municipal governance & infrastructure development project financed by the World Bank & its partners, aimed at improving access to urban infrastructure & strengthening municipal governance in Somalia. The government of Somalia, through the Benadir Regional Administration (Mogadishu) representing multiple cities has selected our client to provide the consulting services for the urban transport infrastructure works to be executed by the Project Implementation Unit (PIU) of the respective municipalities under the project. The works involve construction of urban roads to bitumen standards, construction of bridges / drainage works & installation of streetlights, by the contractors engaged by the respective PIU. Our client assists the PIUs in the contracts management, supervision of works implementation by the contractors as well as in other technical areas related to the project activities. The scope of our clients engagement is to provide technical assistance to the PIUs in the works implementation & contracts managements in the areas of design review, technical supervision, performance monitoring, quality control etc., as well as contributing to PIUs capacity building.

Role objectives

The Drainage Engineer is responsible for the review of existing drainage system functionality, for assessing the system improvement requirements & developing improvement measures including detailed designs for the works implementation. More specific roles of the job are outlined below. The specific duties would involve:

Study & assess the storm water drainage flows using all available data & information including (but not limited to) past studies, rainfall data, catchment data, contour maps as well as information collected through local authorities & community consultation.

Site visits, community consultation, government liaison as part of drainage assessment & developments of drainage management solutions.

Review the performance of the existing storm water drainage system including disposal facilities considering the hydraulic capacity, assets condition, maintenance requirements, storm water quality management etc. & report on the system performance identifying most critical components requiring immediate interventions (both maintenance & capital works).

Establish design parameters, develop optimum drainage solutions considering both immediate interventions & long term solutions.

Prepare designs including design drawings, specifications, bill of quantities to the required standard to be included in tender documents.

Preparation of investigation & design reports as well as related communication material for the donor & the stakeholder sharing.

General technical support including during the tendering process & the works implementation.

Expected outputs include but are not limited to:

Assessment report of existing drainage.

Design review & technical review of project design, during

An error has occurred. This application may no longer respond until reloaded. Reload 🗙